Call Us

+86 189 0200 6688

Home > Products > SSAW Steel Pipe > Piling Pipe

Piling EN10219 S275J2 S355J0 Spiral Steel Pipe

Share

Large Diameter spiral steel pipe refers to the spiral steel pipe in big size, which is generally required to be more than 1000mm in diameter.

Product Description

Title goes here.

 Natural Gas Transportation Spiral Seam Steel Helical Welded SSAW Pipe With High Quality .

Product NameSSAW Steel Pipe, Linepipe, Pile Pipe
Outer Diameter8 Inch - 120 Inch ( 219mm-3048mm )
Wall thickness4.5mm - 25.4mm, SCH20, STD, SCH40, XS, SCH80
LengthNormally 12 meters, up to 60 meters
StandardAPI SPEC 5L, ASTM A53/A53M, ASTM A252, ASTM A36, EN10219, EN10296, EN10217, ISO3183, GB/T9711
MaterialGr.B, X42, X52, X60, X65, X70, X80, S235JR, S275J0, S275J2, S355J0, S355JR, S355K2, SS400, STK290, STK400, STK490, STK500, P235TR1, P265TR1, P235TR2, P265TR2
Section ShapeRound Hollow
TechniqueDouble-sided submerged arc welding, spiral forming
EndsPlain end/Beveled, plastic or steel protective cap, welding flange
Surface Treatment1. Varnish coating/oil
2. 3LPE, 3LPP, FBE
3. Galvanized
4. Which client request
Packingbare in loose, plastic packaging, hemp rope binding
MOQ5 Metric tons
OriginTianjin & Hebei ,China
CertificatesISO9001, ISO14001, ISO18001, API 5L, API 5CT, CE, JIS
Delivery TimeUsually within 10-45 days after receipt of down payment (Big Qty shall be further discussed)
Product ApplicationFluid, oil, petroleum, gas, water, steam, onshore, offshore, aboveground, underground, Structural

Low Carbon Welded Steel Ssaw Spiral pipe


FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment, or L/C at sight balance of copy of B/L